Teak floor a slow job but looking fantastic and nearly complete. Then the cockpit. Our icebox is on the way, lots of shaping and sanding. Our shelves are all in, just a few edge trims to go.
More importantly, the big jobs are now outside ones (because the inside ones are finished). Lots of tweaking to do inside, refitting, glueing etc but all designed and substantially on track. BUT still heaps to do, just not as much as last month!!