It’s full on now. Every spare hour of every spare day. If we want to make January our launch month, it’s full steam ahead.
Our outside fairing is very close, our upholstery all confirmed and ordered, bench tops measured with templates completed ready for our cabinet man, galley carcasses in with doors being sprayed as I speak, ceiling panel strapping,wiring on the go … and some light switches even in! And Neville’s treasured electric windows all powered up with switches fitted. So WHY are we worried about January?! We know, everything takes time!
Fitting light switches, trims to cupboards (check out our curved trims on the fibreglass cupboard cut-outs), and planning where the downlights are going really does make us feel like we are on the home strait, but we know there’s still so much detail to go.
Our stainless man Frank is due to arrive tomorrow, along with our fairer and teak man, and our cabinet maker, so it’s all happening.